Announcement
Collapse
No announcement yet.
SBG-PID
Collapse
X
-
@ andi build the latest clone pi and have fun
https://www.geotech1.com/forums/show...ighlight=clone
on our soils we need permant gb autune function and some kind of crap filter
if you search in the norwegian backwoods far away from any settlement you can use a high power analog pi for meteorite hunting
Comment
-
https://www.geotech1.com/forums/atta...7&d=1556082873 schematic is o. k. Ground Ballanse and Discriminator simmular in Goldscan 5.Detector is tested in normall ground.
Comment
-
Originally posted by ivconic View PostAlways hate to see such awkward way of drawing schematics.
Purposely messed up to the level of being completely confusing.
Thanks for the redraw.
Comment
-
Originally posted by scs View PostI noticed error a transistor VT9 is connected back. Please for excuse.[ATTACH]46087[/ATTACH]Originally posted by Andi68 View PostWhich schematic can I now rely on, which is faultless ?
Comment
-
-
Looking at the timing components associated with the CD4538 monostables we have:
Main sample delay = 27us
Main sample pulse width = 33us
EFE sample delay (from the end of the main sample pulse) = 120us (so EFE delay is actually 27us + 33us + 120us = 180us)
EFE pulse width = 33us
At the moment I cannot see how the ground balance is supposed to work. All R19 appears to do is balance the outputs of the main and EFE channels before they enter the final integrator stage. Anyway, with a fixed main sample delay of 27us, is there really any need for GEB?
The discrimination part looks interesting. R17 appears to also balance the main and EFE channels to provide some form of conductivity discrimination, whereby the meter swings one way for low conductivity and the other for high conductivity.
The coil is shown as 20 turns with a 20cm diameter. Depending on the wire thickness, the inductance will be somewhere between 230uH and 280uH.
Comment
Comment